Raw Mill Separator maintenance checklist

 

  O-seap Separator

1- 2 webs inside the separator and the outlet duct have worn out.

2- The air seal have a sever wear and there is part not exist.

3- All separator fixed louvers have a sever wear.

4- The  fixation bolts  between  the  flange  which carrying the  drive  unit  and separator roof have a sever wear.

5- The rubber element of the drive unit coupling is damaged

 

cement raw mill O-seap seperator
cement raw mill O-seap seperator

 

Recommendation:

 

1- Patch the worn out sheet metal for the outlet separator duct and webs

2- Replace the air seal completely due to a sever wear.

3- Replace all guide vanes for the separator due to sever wear

4- Replace the bolts which  fix the drive unit flange with separator  roof due to sever wear.

5- Replace the coupling element and erect the missed elements.

6- The  guide  bearing  of separator  must be changed due to damage  and it  is preferable to change the thrust bearing

 

Action has been taken

 

1- The  worn out  parts  in the  outlet  duct and in rotor  supporting  webs have been patched.

2- The coupling elements and bolts that fix the drive unit flange with separator roof have been replaced

3- Both bearing have been changed

if you have any inquiry please contact me : [email protected] 

 

Previous Post
Next Post

Leave a Comment

Your email address will not be published. Required fields are marked *

10 Essential Cement Plant Calculations

Free PDF — clinker chemistry, kiln sizing, ball mill power, and more. Enter your email and we'll send it immediately.

No spam. Unsubscribe anytime.

Check Your Inbox

Your PDF is on its way. Plus 6 more emails with cement plant tips and case studies.

Ask a Cement Engineer ×
Hello! Ask me any cement plant technical question — kiln, grinding, quality, maintenance, preheater. I'll give you a practical answer.